We built a desk into the corner in Jr's room.
|
|
|
|
The 2nd bedroom (temporarily my room) has some built in shelves as well.
|
|
|
|
A built in desk, shelves, and closet hardware almost complete the 2nd bedroom.
|
|
|
|
|
Two collums on either side of the dining room sliding doors, are the only sections on which I used standard 'stucco'.
|
|
|
|
To pass the "final inspection" necessary for us to legally move in, I had to install all of my exterior light fixtures, including the front porchlight
|
|
|
|
Here it is as of October 1, 2008. Somewhere in the neighborhood of 80% done, and ready for us to move in.
|
|
|