The East wing cap wall is final-coated. I just have to hand apply the top and ends so as to avoid spraying all over the copper roof.
|
|
|
|
Here's what it looks like as of the end of March. S L O W L Y getting there.
|
|
|
|
Running all the electrical and plumbing through the 2nd bathroom wall. These hands were made for painting and filming . . . not plumbing. :-)
|
|
|
|
|
Here's the 2nd bathroom all closed in except the ceiling. The bath tub drain was a real pain! Nope. Not interested in plumbing on the next one.
|
|
|
|
Though it is covered in clutter, here is the poured and cured concrete island countertop just prior to grinding.
|
|
|
|
I finally started my kitchen soffit, recessed lights and all. Cabinets will eventually fill the space between the fridge/freezer and overhead soffit.
|
|
|
|
|
I decided a flat ceiling in the hallway just wasn't going to do. :-) Not tedious and time-consuming enough.
|
|
|