The garage forms are ready and waiting for the pour.
|
|
|
|
Rather than grounding rods, I incorporated a "ufer" ground into my garage slab/rebar. Much more better!
|
|
|
|
I drilled 4 - 3' holes to put my steel culverts into. Two are supports for the loft (above the kitchen) and two are for the roof over the dining room.
|
|
|
|
|
Finishing up the footings forms, and starting to spread the first lift of A/B for the kitchen/dining room floor.
|
|
|
|
Using the loader to lift these 20' long culverts into the air - thus far the scariest thing I've done in building this house.
|
|
|
|
I pondered for six months how I was going to get those two steel tubes up. Glad it's behind me.
|
|
|
|
|
NOT a fan of the cold - but I must admit this sure was a beautiful surprise. Unfortunately weather stalled my concrete pour for two weeks.
|
|
|
|
The occasional visitor.
|
|
|